Mark Bannerman

Mark Bannerman

SMP Supervisor at Illawarra Engineering Services

Location
Sydney Area, Australia
Industry
Mining & Metals

As a LinkedIn member, you'll join 225 million other professionals who are sharing connections, ideas, and opportunities.

  • See who you and Mark Bannerman know in common
  • Get introduced to Mark Bannerman
  • Contact Mark Bannerman directly

View Mark's full profile

Mark Bannerman's Overview

Past
  • HSSE / Site supervisor at Mechcon
  • SMP Supervisor at Illawarra Engineering Services
  • SMP Supervisor at Illawarra Engineering Services
  • SMP Supervisor at TOLCO Pty. Ltd
  • Fitter and turner at ALLFAB constructions
  • Smelter Technician at Port Kembla Copper
Education
  • Wollongong TAFE
  • Bulli High School
Connections

59 connections

Websites

Mark Bannerman's Experience

HSSE / Site supervisor

Mechcon

August 2012January 2013 (6 months) Mackay Area, Australia

During the construction of a new B-double loading gantry at the Shell Mackay Terminal, I was the HSSE representative/site supervisor. The site was still a live site, and as such, loading of fuel trucks continued for the duration of the project. All work in and around the existing gantry was managed via the permit system. The project was completed without major impact to the still operating site and with NO injuries.
My role was to liaise with the client / contractors, organize, write, issue and validate permits. Reporting to the project engineer in Brisbane, keeping records of daily activities, incidents, manhours, project schedule, any issues that did or could arise and holding inductions for new contractors.

SMP Supervisor

Illawarra Engineering Services

March 2011August 2012 (1 year 6 months) Wilipinjong Coal mine

An upgrade of the existing site to include an additional ROM dump bin / sizing station / raw coal stockpile / reclaim tunnels / overland conveyors / extension of CPP / transfer station / clean coal stacker - with tasks including:
Steel erection.
Installation of new coal handling systems/conveyor belts
Heavy / dual lifts in excess of 100T
Sample stations
Crushing plants
Installation of air and water/fire water systems
·Tie-ins & installation to Brownfields/existing operational areas
Commissioning & Punchlist items on mechanical plant & equipment

SMP Supervisor

Illawarra Engineering Services

July 2010February 2011 (8 months) Mangoola Coal Project

The construction of a new coal mine in the Hunter Valley, NSW. Equipment built included steel erection for ROM dump bin with feeder breaker, Surge bin and Rejects bin. A complete secondary/tertiary sizing station, overland conveyors, reclaim tunnel with 8 coal valves, 2x sample stations, conveyors adjoining each station on the process.
Tasks included:
Steel erection
Materials handling / stock control
Working at heights
Dual crane lifts
Installation of "redi-span" conveyor sections
Heavy lifts, in excess of 65T
Fit out of conveyors with services, eg: water/air/ fire system
Adhering to strict design specifications
Modifications as needed
Working in and around a "live" site

SMP Supervisor

TOLCO Pty. Ltd

Privately Held; 51-200 employees; Mechanical or Industrial Engineering industry

February 2009July 2010 (1 year 6 months) Port Kembla, NSW

Three projects with Tolco including WESTVAMP / MORGAN CEMENT 300TPH upgrade / #5 Blast Furnace re-line

The Westcliff coal mine Ventilation Air Methane Project was an overhaul of the Vocsidizer system that converts methane gas to heat energy, in turn running a 5mw steam turbine. Tasks included:
Stripping the vocs down to lower layers to expose boiler tubes
Remove boiler tubes
Remove and replace catalyst material
Remove heat affected Kaowool (carcinogenic)
Re-instate/weld out boiler tubes, both steel and chromoly with 100% NDT/X-ray
Installation of new fanhouse/blower station
Modifications to existing systems to allow extra capacity

Morgan Cement 300TPH upgrade - Installation of a new ball mill and product handling systems and extension of existing building. Tasks included:
Civil, structural, mechanical and pipe work of No 3 mill including associated product transfer and handling air slides, bucket elevators, conveyors and separators, transformer installation, silo installation, cooling systems, lubrication systems, dust extraction systems

#5 Blast furnace reline - Installation of 600 ID Basalt lined pipe for the slag granulation system (>1200m in length), new warman pumps, refractory lined slag runners. Tasks included:
Correct bolting and tensioning of all flanged connections
Removal of old pumps
Civil works to accomodate new pumps
Survey and marking out
Interactions with other work crews
Hydro testing all lines
QA
Tie-ins & installation to Brownfields/existing operational plant
Commissioning & Punchlist items on mechanical plant & equipment

Fitter and turner

ALLFAB constructions

October 2002August 2006 (3 years 11 months) Port Kembla Steel works, NSW

Both planned and unscheduled maintenance throughout all departments of the BSL Steel works and BHP Billinton coal washery.
Tasks / equipment worked on: (but not limited to)
Product handling conveyors
Overhead cranes
Various mills
Bench fitting
Pump / roll alignment
Coke ovens gas mains (hazardous area)
Repair/replace crane/train rails
Structural steel
Cryogenic plant maintenance
Working around "hot metal" areas
Mechanical installations/repairs

Smelter Technician

Port Kembla Copper

20002002 (2 years)

Mark Bannerman's Education

Wollongong TAFE

Mechanical Engineering (Trade), Fitting and turning

19931996

Bulli High School

19881992

Mark Bannerman's Additional Information

Contact Mark for:

  • career opportunities
  • consulting offers
  • new ventures
  • job inquiries
  • expertise requests
  • business deals
  • reference requests
  • getting back in touch

View Mark Bannerman’s full profile to...

  • See who you and Mark Bannerman know in common
  • Get introduced to Mark Bannerman
  • Contact Mark Bannerman directly

View Full Profile

Not the Mark Bannerman you were looking for? View more »

Viewers of this profile also viewed...